Browsed by
Month: July 2022

Critical look at Paul Wreyford’s Alternative Access Road link proposal for Planning Application 22/01485/OUTEIA

Critical look at Paul Wreyford’s Alternative Access Road link proposal for Planning Application 22/01485/OUTEIA

Update ChiCycle have reworked Jubb drawing No SK_C019 to show a modified version of Option2 (the Paul Wreyford Concept). We have some doubts about the design because it may increase congestion for motor-vehicle users but it does leave a viable/direct/convenient cycle and walking route intact along Westgate. The motor traffic figures the developers rely on to justify their choice of Option1A, require a substantial modal shift towards walking and cycling. This is not a realistic expectation because the Option1A solution…

Read More Read More

Chichester City Council Recommend Consideration of Alternative Transport Solutions for Connecting New West of Chichester Development onto A27 is now to be Considered

Chichester City Council Recommend Consideration of Alternative Transport Solutions for Connecting New West of Chichester Development onto A27 is now to be Considered

Chichester City Council met for a Special Meeting of the Planning and Conservation Committee held on 28 July 2022. This was to discuss planning application 22/01485/OUTEIA It was noted that National Highways are now concerned about the developments impact on the Strategic Road Network (SRN). This is likely because congestion from the college roundabout will be exacerbated by the additional traffic from the development and this is likely to tail back onto the A27 trunk road causing traffic jams around…

Read More Read More

Recommended Action: Write in Opposition to the New Development Access Road Plans that will Permanently Sever Chichester’s Cycle Network to the West of Chichester

Recommended Action: Write in Opposition to the New Development Access Road Plans that will Permanently Sever Chichester’s Cycle Network to the West of Chichester

ChiCycle toolkit for commenting/objecting to CDC planning application 22/01485/OUTEIA (this is work in progress so please be patient) If you agree that we must prioritise quality of life for existing residents and enhance the local environment by reducing motor vehicle traffic travelling through our sensitive residential neighbourhoods, then please use the following resources to criticise/oppose these plans to route heavy traffic onto Westgate and Sherborne-Rd. The following material is designed as a convenient reference for anyone wishing to object or…

Read More Read More

Please email Ian Sumnall to add your Name to a Petition for a Proper Tarmac Surface over Centurion Way Footbridge

Please email Ian Sumnall to add your Name to a Petition for a Proper Tarmac Surface over Centurion Way Footbridge

We need to petition the local authorities for a Proper Tarmac Surface over a Centurion Way Footbridge Community Application to WSCC Highways Scheme for vital safety works on Centurion Way Campaign leader: Ian Sumnal – Chichester and District Cycle Forum (CDCF) Location: The crossing of Centurion Way with the pathway to the Country Park, at the old railway bridge near Bishop Luffa Close, Chichester, West Sussex. The Problem: The Centurion Way tarmac pathway leaves the heritage rail route and descends…

Read More Read More

Oakland’s Park Pop-Up Music Event Sunday 17th July a Great Success

Oakland’s Park Pop-Up Music Event Sunday 17th July a Great Success

Dispute a MET office amber weather warning over extreme heat, everyone appeared to enjoy the music performances in comfort. Some images of the ChiCycle Oakland’s Park Pop-Up Music Event are captured in the media gallery below. An audio clip of Sophie Hodgson’s performance is available below. An audio clip of Alex Roberts performance is available below. An audio clip of Nigel Rippon with Drone in the Woods (Keith Sutton) performance is available below. In addition to ChiCycle’s thanks to the…

Read More Read More

Phase2 West of Chichester Outline Application Disregards Walking and Cycling National Standards

Phase2 West of Chichester Outline Application Disregards Walking and Cycling National Standards

Although the outline application plans include some provisions or walking and cycling, cycle routes to the West of the city will be made unusable or extremely inconvenient to ride at a number of key locations. This will break the connection of National Cycle Route No2 (South Coast Cycle Route) through the west of the city. This will end cycling aa practical, convenient form of transit in the west of Chichester and along the coast to Fishbourne and Bosham. Quiet roads…

Read More Read More